![]() For clamshell or concrete bucket operation, the weight of bucket and load must not exceed 80% of rated lifting capacities. Do not tip the machine to determine allowable loads. Rated loads at rated radius shall not be exceeded.Lifting operations risk assessment example Do not travel with crane boom extension or jib erected.With the certain boom and hoist tackle combinations, maximum capacities may not be obtainable with standard cable lengths.Tires shall be inflated to the recommended pressure before lifting on rubber.When equipped with an extendable counterweight, the counterweight shall be fully extended before operation.If the machine is equipped with a front jack cylinder, the front jack cylinder shall be set in accordance with written procedure. ![]() ![]() ![]()